You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Embung Di Jalan Ahmad Yani Masih Mangkrak

Water Reservoir Construction at Jalan Ahmad Yani Stuck

The construction of water reservoir at Jalan Ahmad Yani, Cempaka Putih Timur Urban Village, Cempaka Putih, Central Jakarta, stuck and not known when it will be finished.

Rainy season is coming, we're afraid the flood would be as high as previous year

"The construction is not finished yet whereas it's needed to handle flood on the road," said Saiful (32), a local resident, Thursday (10/22).

Flood Anticipation, Dredging of Water Channels in Central Jakarta Prioritized

Residents hope the construction to be finished so that the access road would not get overflowed like previous year.

"Rainy season is coming, we're afraid the flood would be as high as previous year," he expressed.

Cempaka Putih Timur Urban Village Head, Sri Harmo confirmed about the matter. His party hopes the related institute could complete the construction.

"Certainly the area is the worst flood point in Cempaka Putih," he disclosed.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1988 personAldi Geri Lumban Tobing
  2. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye1050 personDessy Suciati
  3. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye906 personAldi Geri Lumban Tobing
  4. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye800 personFakhrizal Fakhri
  5. Cipete Selatan Steps Up Waste Management at the Source

    access_time12-06-2026 remove_red_eye710 personTiyo Surya Sakti